Bay Area rules guide
What the Air District's Rule 9-4 requires, what it does not, the dates that moved in 2026, and how to choose between repairing, replacing with gas, or switching to a heat pump if your furnace is failing now.
TurfLocal no longer lists HVAC contractors. Already have a quote? Check it free with HVAC Quote Check. More free tools: all TurfLocal tools.
The Bay Area Air District regulates the nitrogen oxides (NOx) that gas appliances give off. Two of its rules cover home heating: Rule 9-4 for furnaces and Rule 9-6 for water heaters. Both are point-of-sale standards. They set what new equipment must meet, and the Air District says the new requirements "apply only upon burn out of one's current equipment". Its fact page is blunter: "There is no mandate to remove or replace functioning appliances before they fail."
| Equipment | Standard | Applies to units manufactured from |
|---|---|---|
| Residential fan-type central furnaces (the usual forced-air furnace) | Ultra-low NOx | January 1, 2024, already in force |
| Residential and commercial furnaces | Zero NOx | January 1, 2029 |
| Residential water heaters (the usual home tank) | Zero NOx | January 1, 2028, moved from 2027 on November 4, 2026 |
| Water heaters from 75,000 BTU/hr to 2 million BTU/hr, including tankless | Zero NOx | January 1, 2031 |
Sources: the Air District's Rules 9-4 and 9-6 page (last updated November 5, 2026), its implementation page and its Know the Facts page. Gas stoves, ovens and dryers are not covered.
The standard is written around emissions, not fuel. The Air District says a gas appliance that can show it meets the zero-NOx standard would be allowed. In practice, the zero-NOx options it points homeowners to are electric, and a heat pump is the electric option that heats and cools with one system.
Water heaters, November 4, 2026. The Air District's board adopted amendments to Rule 9-6 that move the zero-NOx date for residential water heaters to January 1, 2028. They also add exemptions for qualifying low-income property owners and for properties with significant electrical or space constraints. The rule still applies only when a water heater is replaced.
Furnaces, under review. The Air District held an implementation workshop on the furnace rule on August 27, 2026. HARDI, the trade association of HVAC distributors, reported that staff recommendations would go to the Air District's board on December 2. On the Air District's rule page dated November 5, 2026, the furnace date is still January 1, 2029. If you are reading this after December 2, 2026, check the Air District's page for the outcome before you make a decision that depends on the date.
Nothing in the rule forces a decision this winter. What it changes is the next replacement. A gas furnace installed now can stay until it fails, but new furnaces manufactured from 2029 have to meet the zero-NOx standard. So the real question is how long you expect to keep whatever you install.
| Your situation | Usually sensible | Why |
|---|---|---|
| A newer furnace with one failed part | Repair it | The rule sets standards for new equipment and does not require removing a working furnace. A single part on a sound furnace is routine work. |
| An older furnace facing a major repair, such as a cracked heat exchanger or a failed inducer or blower motor | Replace it, and choose the fuel on purpose | What you install now is the system you will live with for years, and the one after it falls under the 2029 standard. |
| Your air conditioner is old too, or you have none and want cooling | Get a heat pump quote next to the gas quote | One heat pump does both jobs, and the Bay Area's mild winters are well within what an air-source heat pump is built for. |
| Your electrical panel is small or already full | Have the panel assessed before you choose | A heat pump needs electrical capacity. That is the same constraint the new water heater exemptions recognise. |
For the money side of a repair, the repair or replace calculator works from your furnace's age and the quote in your hand. If the furnace has simply stopped, start with why a furnace will not turn on, because a fair share of those calls end at the thermostat, the filter or a switch.
The federal 25C and 25D tax credits ended for equipment placed in service after December 31, 2025. California's TECH Clean California and HEEHRA single-family heat pump incentives were both fully reserved by February 2026. Our heat pump incentives checker shows what is still open, with the date of each change. The Air District itself points residents to The Switch Is On for current incentives and financing.
FAQ
Not in the way the headlines suggest. The Air District's Rule 9-4 sets a zero-NOx emissions standard for new furnaces manufactured from January 1, 2029. It does not require anyone to remove a working furnace, and it applies when equipment is replaced. It gets called a ban because the furnaces that meet a zero-NOx standard today are electric.
No. The Air District says there is no mandate to remove or replace functioning appliances before they fail. The standards apply to new equipment.
Yes. Until the zero-NOx date, a new residential central gas furnace has to meet the ultra-low NOx standard that has applied to units manufactured since January 1, 2024. Ask the contractor to confirm that the model on your quote meets it.
New furnaces manufactured from that date have to meet the zero-NOx standard, which in practice means an electric option such as a heat pump. Whether a gas unit made before that date can still be installed is a question for your contractor and the Air District. Its board was also due to review the furnace rule on December 2, 2026, so check the Air District's page for the current dates.
No. The Air District says stoves, ovens, dryers and other cooking appliances are not affected, and that it has no plan to regulate them.
Yes. On November 4, 2026 the Air District's board moved the zero-NOx date for residential water heaters to January 1, 2028. It also added exemptions for qualifying low-income property owners and for properties with significant electrical or space constraints.